Set of equipment (capacity 20 m3 per shift)
Manual loading line for polystyrene concrete and foamed concrete blocks’ production
(capacity 20m3 per shift)
1. Steam generator
2. Dryer for EPS granules
3. PND-500 Automatic Pre-Expander (EPS Machine)
4. Ageing bunkers
5. Pneumatic system
6. Volumetric batcher of polystyrene granules
7. Water meter
8. RS-1000 Mixer
9. Moulds FM-1,47 m3
10. RK-3 Cutting set
11. Storage area for finished product
#
|
Item
|
Q-ty
|
Sector of storage,
preparation and feeding of raw materials
|
1
|
DV-1700 Water meter
|
1
|
2
|
Water pump 17 m3/h
|
1
|
Sector of EPS foaming
|
1
|
PND-500 Pre-Expander
|
1
|
2
|
PGES-50 Steam generator
|
1
|
3
|
Dryer for EPS granules
|
1
|
4
|
Ageing bunker for EPS granules 40 m3 (it is possible
to provide schemes for individual processing)
|
2
|
5
|
Pneumatic system*
|
1
|
|
List
of equipment:
|
|
|
Air fans
|
|
|
Pipeline
|
|
|
Gates
|
|
|
Plugs, adapters
|
|
Mixing sector
|
1
|
Volumetric batcher of polystyrene granules 1 m3
|
1
|
2
|
RS-1000
mixer of polystyrene concrete (with embedded gerotor pump)
|
1
|
Thermal treatment
sector
Thermal treatment cases are made
by customer according to the project
|
Sector of polystyrene
concrete mass sawing
|
1
|
RK-3 Cutting set for sawing of mass on blocks of definite sizes +
mass gripper
|
1
|
2
|
Mould for concrete filling (V – 1,47 m3) (it is possible to provide
schemes for individual processing)*
|
14
|
* Final cost is determined after the stage of design in view of a
placement.
Area of production
site required min - ???‚ 300 m2
Temperature indoor
min +15, +200 ??
Electric power
required 30-50* kW/hr
Water supply
required.
Staff required – 4
persons, technologist/supervisor – 1 person.
Additional services
|
1
|
Visit of our technologist for equipment adjustment, proportioning,
development of processing methods for make-up of polystyrene concrete and
foam concrete using raw materials of the Customer, and also staff training
|
By agreement
|
List of additional
equipment and materials for polystyrene concrete blocks’ production
|
#
|
Item
|
Q-ty
|
Special vehicles
|
1
|
Automated
forklift (2-3tons)
|
1
|
Additional equipment
|
2
|
Balanced
ventilation system
|
1
|
3
|
Stocking
hydraulic carts
|
1
|
4
|
Household
equipment, tools
|
|
Other
|
Consumption per month
(25 work. days)
|
5
|
Pallets
for blocks stacking (reusable), pcs.
|
500
|
6
|
Machine
for strapping with polypropylene type, 1 pc.
|
---
|
7
|
Polypropylene
string,
m
|
7000
|
8
|
Wrap
tape,
m
|
15000
|
Material consumption (polystyrene concrete).*
Mark by average
density
|
D 200
|
D 300
|
D 400
|
D 500
|
Material consumption
|
Cement, t
|
1 m3
|
0,2
|
0,25
|
0,35
|
0,4
|
Shift
|
4
|
5
|
7
|
8
|
Polystyrene granules,
m3
|
1 m3
|
1
|
1
|
1
|
1
|
Shift
|
20
|
20
|
20
|
20
|
Admixture, kg
|
1 m3
|
0,6
|
0,5
|
0,4
|
0,3
|
Shift
|
12
|
10
|
8
|
6
|
Material consumption (foamed concrete).*
Mark by average
density
|
D 450
|
D 500
|
Material consumption
|
Cement, t
|
1 m3
|
0,43
|
0,45
|
Shift
|
17,2
|
18
|
Foaming agent, kg
|
1 m3
|
0,9
|
0,8
|
Shift
|
36
|
32
|