Item
|
Q-ty
|
1
|
Complex of design and technological development on non-autoclave concrete production
|
1
|
|
- process design of the line;
- layout arrangements (plan of equipment placement) on customer’s areas);
- estimation of company’s work pattern and production plan;
- estimation of acceptance and storage site of raw materials and components;
- estimation of mixing site;
- equipment selection and specification;
- description of non-autoclave concrete products’ manufacturing techniques;
|
|
|
Technologist’s visit for start-up of the line, development of processing methods for products manufacturing, and also staff training.
|
|
|
Development of individual process regulations of goods’ production.
|
|
Sector of storage, preparation and feeding of raw materials
|
1
|
Silo for cement storage, 50 tons
(set of drawings)
|
1
|
|
List of equipment:
|
|
|
Filter
|
|
|
Feeding pipeline
|
|
|
Ladder
|
|
|
Hatch
|
|
|
Head guard
|
|
|
Aeration system
|
|
|
Collector
|
|
|
Vibrator
|
|
|
Cement shuttle
|
|
2
|
Cement screw conveyor
(L - 6 m*, gear motor (Italy), N – 4 kW)
|
1
|
3
|
Sand receiving hopper V-3m³ (set of drawings)
|
1
|
|
List of equipment:
|
|
|
El. Vibrator EV-320 (N-0,2 kW)
|
|
|
Knife gate
|
|
4
|
VG-1 Vibrocribble (N– 3 kW, capacity – from 1 t/hr)
|
1
|
5
|
Belt conveyor for sand (L - 7m*, N – 3 kW)
|
1
|
6
|
Water treatment complex (N – 27 kW)*
|
1
|
|
List of equipment:
|
|
|
Bin for storage and warming of water (V – 1,0 m3)
|
2
|
|
Electric boiler (24 kW)
|
1
|
|
Circulating pump
|
1
|
|
Water boosting pump
|
1
|
|
Float switch
|
1
|
|
Solenoid valve
|
1
|
|
One-way valve
|
1
|
|
DV-1700 Electronic water gauge
|
1
|
|
Control panel
|
1
|
|
Frame
|
1
|
|
Switching system
|
1
|
Mixing sector
|
1
|
Platform (set of drawings)
|
1
|
2
|
Electronic control system*
|
1
|
3
|
Weigh hopper
(2 sections, weighing capacity range to 1000 kg)
|
1
|
|
List of equipment:
|
|
|
Strain sensors
|
4
|
|
Disk shutter with pneumatic drive
|
1
|
|
El. Vibrator EV-320 (N- 0,2 kW)
|
1
|
4
|
DHD-2 Chemical admixtures batcher (N- 2 kW)
|
1
|
|
List of equipment:
|
|
|
Stainless mixer 120 l
|
2
|
|
Chemical pump
|
2
|
|
Solenoid valve
|
2
|
|
Switching system
|
1
|
|
Control panel
|
1
|
5
|
GB-0,85 Mixer for aerated concrete
(N-7,5 kW, V- 0,85m3)
|
1
|
Sawing sector
|
1
|
ARK Automated cutting set for sawing foam concrete mass both vertically and horizontally with saw bands* (N- 13 kW)
|
1
|
|
List of equipment:
|
|
|
Rail tracks, L-2,4 m
|
2
|
|
Remote control panel
|
1
|
2
|
Mould for foamed concrete filling
(V – 0,85 m3)
|
35
|